Art Direction, UI/UX Design, Design System

Software platform redesign

Part of the continuous improvement process of their underwater oil platform design softwares: Subsea Studio FD and Subsea Studio EX, TechnipFMC asked Deloitte Digital to improve the user friendliness and aesthetics of some of the most critical screens and functionalities of their softwares.

Approach

Deloitte Digital has opted for a two-phase approach. A first part of study and benchmark in order to assess the relevance of the existing design choices and the good use of UI / UX practices (accessibility standards, navigation, etc.).

Then a second part of interface design in order to standardise the use of all the graphic elements used on each page (typography, colors, buttons,) but also the design of reusable page templates and finally the formalisation of all these elements in a design system.

Login img1 1440@3x.png
 
 
My Projects Dashboard 1440@3x.png
 
System configurator 1A HOVER 1440@3x.png
 
05 EX - Project 2 1440@3x.png

Design system

Previous
Previous

Signify | Installer mobile app

Next
Next

Chanel | Clientelling mobile app design